Transporter Payment Statements

eLOGIC / WEIGHBRIDGE / FINANCIAL-MONTH REPORT

Transporter Payment Statement

UNPRICED POPUP ENABLED · KG → METRIC TONS · R/TON · VAT

16–30 September 2024 · 2024-09-16 to 2024-09-30 · TAT

Crysler: Connected Buick: Connected Transactions Audit Unpriced Audit Not Invoiced
Weight unit correction active. Raw Crysler and Buick API NETTWEIGHT is configured as kilograms and converted to metric tons (÷ 1,000) before calculating loads, statement tonnage and subcontractor payment. Previously displayed financial amounts were inflated because kilograms were treated as tons. Verify this configuration against an actual weighbridge slip before approving payments.
Show raw-weight-to-ton reconciliation (up to 5 loads)
WeighbridgeRECNOTRANNORaw NETTWEIGHT (kg)Converted (t)
Buick 311357 658297 36,360.000 36.360
Buick 311317 658257 30,920.000 30.920
Buick 310233 658132 34,900.000 34.900
Buick 310116 658015 38,060.000 38.060
Buick 310061 657960 35,320.000 35.320
Statement Filters
Selected dates: 2024-09-16 through 2024-09-30 (inclusive)
Changes apply automatically. Both periods shows separate payment totals for each half of the month.
Completed Loads25
Vehicles Used1
Nett Tons (t)858.460
Selected dates2024-09-16 – 2024-09-30
Priced Loads0 / 25
Subcontractor Ex VATR 0.00
Subcontractor VATR 0.00
To Pay Incl VAT (partial)R 0.00
Saved Invoices / Already Invoiced Tickets Previously saved invoices and their exact ticket lists are always accessible, even without an API connection.
25 load(s) without pricing. Payable totals are partial until these loads are assigned.
Payment statement: 2024-09-16 through 2024-09-30 (inclusive)
eLOGIC / BLACKMAGIC
TRANSPORTER SUBCONTRACTOR PAYMENT STATEMENT

TAT

Completed weighbridge loads for the selected payment period
STATEMENT TS-202409-P2-DD8EBA1E 16–30 September 2024
Transporter / CompanyTAT
Statement Period16 Sep 2024 – 30 Sep 2024
Date Generated29 Nov 2026
Reporting PeriodCompleted payment period
Vehicles1
Completed Loads25
Total Nett Tons858.460 t
Subcontractor Ex VATR 0.00
VAT on Completed LoadsR 0.00
Payable Incl VAT (partial)R 0.00
Transporter Summary 47 transporter groups this payment period
#TransporterCompleted LoadsVehicles UsedNett Tons (t)Priced LoadsTo Pay Incl VATStatement
1TAT 25 1 858.460 0 / 25 R 0.00 partial
TOTAL (current selection)251858.4600 / 25R 0.00
Save Invoice · TATView Saved Invoices

0 already invoiced · 25 not yet invoiced · 25 still need pricing.

New uninvoiced tonnes
858.460 t
New invoice VAT
R 0.00
New invoice payable (partial until priced)
R 0.00

Save the remaining uninvoiced loads for 16–30 September 2024. Every saved invoice permanently captures the subcontractor, first/last transaction time, each ticket, its rate, VAT and totals. The normal statement still shows all transactions, including saved ones; only not-yet-invoiced loads are included in the new amount above.

Preview Current Statement
Automatic Train Pricing · TATVessels are manual
Set this once. When you open either payment period or the full month, new unpriced tickets carrying T9886, BT4534 or another explicit T/BT train reference automatically receive this saved train rate. Already-priced tickets keep their original saved rate. VS vessel tickets and unclear references always require manual pricing. All applied rates appear in the normal statement and Preview Invoice.
Vehicle Transactions, Pricing & Payments
1 registrations / groups · 25 completed loads
Tick the load checkboxes below to apply this rate only to those transactions (including previously priced loads). Apply to All covers this subcontractor's entire selected payment period, even other pages. Both options replace rates only for not-yet-invoiced tickets; saved invoice rates are locked. Select Unassign pricing to clear rates on uninvoiced loads.
0 loads selected on this page
Vehicle Registration Loads RECNO TRANNO Order No Source → Destination Material Nett Tons (t) Pricing / Rate (R per ton) Amount Incl VAT (R)
JHB415EC 25 completed loads Load 1 306767 654671 —
Other / manual
495 → SANTO LUMPY 33.500
Not assigned
Not priced
—
Load 2 306825 654729 —
Other / manual
495 → SANTO LUMPY 33.360
Not assigned
Not priced
—
Load 3 306874 654778 —
Other / manual
495 → SANTO LUMPY 33.760
Not assigned
Not priced
—
Load 4 306962 654866 —
Other / manual
495 → SANTO LUMPY 35.840
Not assigned
Not priced
—
Load 5 308455 656359 —
Other / manual
CS2 → EPTA W4L40 30.840
Not assigned
Not priced
—
Load 6 309294 657194 —
Other / manual
BS1 → AERIK SINTER 30.360
Not assigned
Not priced
—
Load 7 309334 657234 —
Other / manual
BS1 → AERIK SINTER 33.260
Not assigned
Not priced
—
Load 8 309373 657273 —
Other / manual
BS1 → AERIK SINTER 32.520
Not assigned
Not priced
—
Load 9 309408 657308 —
Other / manual
BS1 → AERIK SINTER 35.340
Not assigned
Not priced
—
Load 10 309430 657330 —
Other / manual
BS1 → AERIK SINTER 32.940
Not assigned
Not priced
—
Load 11 309476 657376 —
Other / manual
BS1 → AERIK SINTER 32.600
Not assigned
Not priced
—
Load 12 309519 657419 —
Other / manual
BS1 → AERIK SINTER 34.080
Not assigned
Not priced
—
Load 13 309568 657468 —
Other / manual
BS1 → AERIK SINTER 38.140
Not assigned
Not priced
—
Load 14 309615 657515 —
Other / manual
BS1 → AERIK SINTER 33.780
Not assigned
Not priced
—
Load 15 309701 657601 —
Other / manual
BS1 → AERIK SINTER 33.580
Not assigned
Not priced
—
Load 16 309802 657702 —
Other / manual
BT0747 → AERIK SINTER 34.720
Not assigned
Not priced
—
Load 17 309898 657797 —
Other / manual
BS1 → AERIK SINTER 37.360
Not assigned
Not priced
—
Load 18 309946 657845 —
Other / manual
BS1 → SHANG SINTER 36.600
Not assigned
Not priced
—
Load 19 309995 657894 —
Other / manual
BS1 → SHANG SINTER 34.960
Not assigned
Not priced
—
Load 20 310037 657936 —
Other / manual
BS1 → SHANG SINTER 35.360
Not assigned
Not priced
—
Load 21 310061 657960 —
Other / manual
BS1 → SHANG SINTER 35.320
Not assigned
Not priced
—
Load 22 310116 658015 —
Other / manual
BT0748 → SHANG SINTER 38.060
Not assigned
Not priced
—
Load 23 310233 658132 —
Other / manual
BT0748 → SHANG SINTER 34.900
Not assigned
Not priced
—
Load 24 311317 658257 —
Other / manual
BS1 → SHANG SINTER 30.920
Not assigned
Not priced
—
Load 25 311357 658297 —
Other / manual
BS1 → SHANG SINTER 36.360
Not assigned
Not priced
—
JHB415EC subtotal  ·  25 loads 858.460 0 / 25 priced R 0.00
GRAND TOTAL  ·  25 completed loads  ·  1 vehicles 858.460 t 0 priced / 25 unpriced R 0.00
eLOGIC · SUBCONTRACTOR PRICING

Assign Pricing to Unpriced Loads

TAT · 16–30 September 2024

Unpriced loads25
Unpriced net tons858.460 t
Selected for pricing0 loads
Select Vehicle Registration RECNO TRANNO ORDERNO Source → Destination Nett Tons
JHB415EC 306767 654671 — 495 → SANTO 33.500
JHB415EC 306825 654729 — 495 → SANTO 33.360
JHB415EC 306874 654778 — 495 → SANTO 33.760
JHB415EC 306962 654866 — 495 → SANTO 35.840
JHB415EC 308455 656359 — CS2 → EPTA 30.840
JHB415EC 309294 657194 — BS1 → AERIK 30.360
JHB415EC 309334 657234 — BS1 → AERIK 33.260
JHB415EC 309373 657273 — BS1 → AERIK 32.520
JHB415EC 309408 657308 — BS1 → AERIK 35.340
JHB415EC 309430 657330 — BS1 → AERIK 32.940
JHB415EC 309476 657376 — BS1 → AERIK 32.600
JHB415EC 309519 657419 — BS1 → AERIK 34.080
JHB415EC 309568 657468 — BS1 → AERIK 38.140
JHB415EC 309615 657515 — BS1 → AERIK 33.780
JHB415EC 309701 657601 — BS1 → AERIK 33.580
JHB415EC 309802 657702 — BT0747 → AERIK 34.720
JHB415EC 309898 657797 — BS1 → AERIK 37.360
JHB415EC 309946 657845 — BS1 → SHANG 36.600
JHB415EC 309995 657894 — BS1 → SHANG 34.960
JHB415EC 310037 657936 — BS1 → SHANG 35.360
JHB415EC 310061 657960 — BS1 → SHANG 35.320
JHB415EC 310116 658015 — BT0748 → SHANG 38.060
JHB415EC 310233 658132 — BT0748 → SHANG 34.900
JHB415EC 311317 658257 — BS1 → SHANG 30.920
JHB415EC 311357 658297 — BS1 → SHANG 36.360
Pricing is per metric ton. Each priced load uses the upstream raw NETTWEIGHT converted from kilograms to metric tons (÷ 1,000), then multiplies by its saved subcontractor-rate snapshot, with VAT calculated per line and rounded to cents. VAT-inclusive rates are NOT charged VAT twice. Monetary totals sum priced loads only; 25 unpriced load(s) are excluded, so the amount is partial. This is a subcontractor settlement statement, not a tax invoice.
Saved ticket corrections applied: 0.
Statement validation: 9 period-dated transaction(s) excluded because NETTWEIGHT is zero/negative or missing; 0 API row(s) excluded because TRANDATETIME could not be read; 0 exact duplicate(s) ignored; 2,403 completed load(s) have no TRANSPORTER; 0 completed load(s) have no TRUCKNO.
One completed load is one transaction whose TRANDATETIME falls within the selected date range (both periods, one half-month, or a custom range within the selected calendar month) and whose NETTWEIGHT is greater than zero. Unique vehicle count is based on TRUCKNO; missing numbers are not counted as vehicles. Crysler and Buick NETTWEIGHT values are configured as kilograms and divided by 1,000 to metric tons before any summary or R/ton payment calculations; verify against the weighbridge slip. Train rate defaults are configured per subcontractor; new unpriced T/BT train loads receive the selected tariff, while VS vessel loads need manual pricing. Saved pricing is a R/ton subcontractor rate snapshot; it does not overwrite API data. Money is calculated to two decimals per load, including VAT per saved price settings. The selected payment statement remains provisional until its payment period ends. When all transporters are selected, unique vehicles are counted across the whole fleet; the same truck can appear under more than one transporter. Upstream transaction data is never changed; local pricing assignments are saved in MySQL.