Transporter Payment Statements

eLOGIC / WEIGHBRIDGE / FINANCIAL-MONTH REPORT

Transporter Payment Statement

UNPRICED POPUP ENABLED · KG → METRIC TONS · R/TON · VAT

1–15 October 2024 · 2024-10-01 to 2024-10-15 · ROCKSHARE

Crysler: Connected Buick: Connected Transactions Audit Unpriced Audit Not Invoiced
Weight unit correction active. Raw Crysler and Buick API NETTWEIGHT is configured as kilograms and converted to metric tons (÷ 1,000) before calculating loads, statement tonnage and subcontractor payment. Previously displayed financial amounts were inflated because kilograms were treated as tons. Verify this configuration against an actual weighbridge slip before approving payments.
Show raw-weight-to-ton reconciliation (up to 5 loads)
WeighbridgeRECNOTRANNORaw NETTWEIGHT (kg)Converted (t)
Crysler 309244 821527 34,000.000 34.000
Crysler 309243 821526 33,620.000 33.620
Crysler 309229 821512 35,180.000 35.180
Crysler 309224 821507 34,820.000 34.820
Statement Filters
Selected dates: 2024-10-01 through 2024-10-15 (inclusive)
Changes apply automatically. Both periods shows separate payment totals for each half of the month.
Completed Loads4
Vehicles Used2
Nett Tons (t)137.620
Selected dates2024-10-01 – 2024-10-15
Priced Loads0 / 4
Subcontractor Ex VATR 0.00
Subcontractor VATR 0.00
To Pay Incl VAT (partial)R 0.00
Saved Invoices / Already Invoiced Tickets Previously saved invoices and their exact ticket lists are always accessible, even without an API connection.
4 load(s) without pricing. Payable totals are partial until these loads are assigned.
Payment statement: 2024-10-01 through 2024-10-15 (inclusive)
eLOGIC / BLACKMAGIC
TRANSPORTER SUBCONTRACTOR PAYMENT STATEMENT

ROCKSHARE

Completed weighbridge loads for the selected payment period
STATEMENT TS-202410-P1-25F426D8 1–15 October 2024
Transporter / CompanyROCKSHARE
Statement Period01 Oct 2024 – 15 Oct 2024
Date Generated29 Nov 2026
Reporting PeriodCompleted payment period
Vehicles2
Completed Loads4
Total Nett Tons137.620 t
Subcontractor Ex VATR 0.00
VAT on Completed LoadsR 0.00
Payable Incl VAT (partial)R 0.00
Transporter Summary 43 transporter groups this payment period
#TransporterCompleted LoadsVehicles UsedNett Tons (t)Priced LoadsTo Pay Incl VATStatement
1ROCKSHARE 4 2 137.620 0 / 4 R 0.00 partial
TOTAL (current selection)42137.6200 / 4R 0.00
Save Invoice · ROCKSHAREView Saved Invoices

0 already invoiced · 4 not yet invoiced · 4 still need pricing.

New uninvoiced tonnes
137.620 t
New invoice VAT
R 0.00
New invoice payable (partial until priced)
R 0.00

Save the remaining uninvoiced loads for 1–15 October 2024. Every saved invoice permanently captures the subcontractor, first/last transaction time, each ticket, its rate, VAT and totals. The normal statement still shows all transactions, including saved ones; only not-yet-invoiced loads are included in the new amount above.

Preview Current Statement
Automatic Train Pricing · ROCKSHAREVessels are manual
Set this once. When you open either payment period or the full month, new unpriced tickets carrying T9886, BT4534 or another explicit T/BT train reference automatically receive this saved train rate. Already-priced tickets keep their original saved rate. VS vessel tickets and unclear references always require manual pricing. All applied rates appear in the normal statement and Preview Invoice.
Vehicle Transactions, Pricing & Payments
2 registrations / groups · 4 completed loads
Tick the load checkboxes below to apply this rate only to those transactions (including previously priced loads). Apply to All covers this subcontractor's entire selected payment period, even other pages. Both options replace rates only for not-yet-invoiced tickets; saved invoice rates are locked. Select Unassign pricing to clear rates on uninvoiced loads.
0 loads selected on this page
Vehicle Registration Loads RECNO TRANNO Order No Source → Destination Material Nett Tons (t) Pricing / Rate (R per ton) Amount Incl VAT (R)
HWV181FS 2 completed loads Load 1 309229 821512 —
Other / manual
BS1 → SHANG SINTER 35.180
Not assigned
Not priced
—
Load 2 309244 821527 —
Other / manual
BS1 → SHANG SINTER 34.000
Not assigned
Not priced
—
HWV181FS subtotal  ·  2 loads 69.180 0 / 2 priced R 0.00
HWV185FS 2 completed loads Load 1 309224 821507 —
Other / manual
BS1 → SHANG SINTER 34.820
Not assigned
Not priced
—
Load 2 309243 821526 —
Other / manual
BS1 → SHANG SINTER 33.620
Not assigned
Not priced
—
HWV185FS subtotal  ·  2 loads 68.440 0 / 2 priced R 0.00
GRAND TOTAL  ·  4 completed loads  ·  2 vehicles 137.620 t 0 priced / 4 unpriced R 0.00
eLOGIC · SUBCONTRACTOR PRICING

Assign Pricing to Unpriced Loads

ROCKSHARE · 1–15 October 2024

Unpriced loads4
Unpriced net tons137.620 t
Selected for pricing0 loads
Select Vehicle Registration RECNO TRANNO ORDERNO Source → Destination Nett Tons
HWV181FS 309229 821512 — BS1 → SHANG 35.180
HWV181FS 309244 821527 — BS1 → SHANG 34.000
HWV185FS 309224 821507 — BS1 → SHANG 34.820
HWV185FS 309243 821526 — BS1 → SHANG 33.620
Pricing is per metric ton. Each priced load uses the upstream raw NETTWEIGHT converted from kilograms to metric tons (÷ 1,000), then multiplies by its saved subcontractor-rate snapshot, with VAT calculated per line and rounded to cents. VAT-inclusive rates are NOT charged VAT twice. Monetary totals sum priced loads only; 4 unpriced load(s) are excluded, so the amount is partial. This is a subcontractor settlement statement, not a tax invoice.
Saved ticket corrections applied: 0.
Statement validation: 1 period-dated transaction(s) excluded because NETTWEIGHT is zero/negative or missing; 0 API row(s) excluded because TRANDATETIME could not be read; 0 exact duplicate(s) ignored; 1,186 completed load(s) have no TRANSPORTER; 0 completed load(s) have no TRUCKNO.
One completed load is one transaction whose TRANDATETIME falls within the selected date range (both periods, one half-month, or a custom range within the selected calendar month) and whose NETTWEIGHT is greater than zero. Unique vehicle count is based on TRUCKNO; missing numbers are not counted as vehicles. Crysler and Buick NETTWEIGHT values are configured as kilograms and divided by 1,000 to metric tons before any summary or R/ton payment calculations; verify against the weighbridge slip. Train rate defaults are configured per subcontractor; new unpriced T/BT train loads receive the selected tariff, while VS vessel loads need manual pricing. Saved pricing is a R/ton subcontractor rate snapshot; it does not overwrite API data. Money is calculated to two decimals per load, including VAT per saved price settings. The selected payment statement remains provisional until its payment period ends. When all transporters are selected, unique vehicles are counted across the whole fleet; the same truck can appear under more than one transporter. Upstream transaction data is never changed; local pricing assignments are saved in MySQL.