Transporter Payment Statements

eLOGIC / WEIGHBRIDGE / FINANCIAL-MONTH REPORT

Transporter Payment Statement

UNPRICED POPUP ENABLED · KG → METRIC TONS · R/TON · VAT

16–31 October 2024 · 2024-10-16 to 2024-10-31 · MBANDA INVESTMENT

Crysler: Connected Buick: Connected Transactions Audit Unpriced Audit Not Invoiced
Weight unit correction active. Raw Crysler and Buick API NETTWEIGHT is configured as kilograms and converted to metric tons (÷ 1,000) before calculating loads, statement tonnage and subcontractor payment. Previously displayed financial amounts were inflated because kilograms were treated as tons. Verify this configuration against an actual weighbridge slip before approving payments.
Show raw-weight-to-ton reconciliation (up to 5 loads)
WeighbridgeRECNOTRANNORaw NETTWEIGHT (kg)Converted (t)
Crysler 312286 823576 32,180.000 32.180
Crysler 312164 823454 32,800.000 32.800
Crysler 312119 823409 38,380.000 38.380
Crysler 312070 823360 36,720.000 36.720
Crysler 312028 823318 36,640.000 36.640
Statement Filters
Selected dates: 2024-10-16 through 2024-10-31 (inclusive)
Changes apply automatically. Both periods shows separate payment totals for each half of the month.
Completed Loads28
Vehicles Used1
Nett Tons (t)975.180
Selected dates2024-10-16 – 2024-10-31
Priced Loads0 / 28
Subcontractor Ex VATR 0.00
Subcontractor VATR 0.00
To Pay Incl VAT (partial)R 0.00
Saved Invoices / Already Invoiced Tickets Previously saved invoices and their exact ticket lists are always accessible, even without an API connection.
28 load(s) without pricing. Payable totals are partial until these loads are assigned.
Payment statement: 2024-10-16 through 2024-10-31 (inclusive)
eLOGIC / BLACKMAGIC
TRANSPORTER SUBCONTRACTOR PAYMENT STATEMENT

MBANDA INVESTMENT

Completed weighbridge loads for the selected payment period
STATEMENT TS-202410-P2-DD1EDBE1 16–31 October 2024
Transporter / CompanyMBANDA INVESTMENT
Statement Period16 Oct 2024 – 31 Oct 2024
Date Generated29 Nov 2026
Reporting PeriodCompleted payment period
Vehicles1
Completed Loads28
Total Nett Tons975.180 t
Subcontractor Ex VATR 0.00
VAT on Completed LoadsR 0.00
Payable Incl VAT (partial)R 0.00
Transporter Summary 50 transporter groups this payment period
#TransporterCompleted LoadsVehicles UsedNett Tons (t)Priced LoadsTo Pay Incl VATStatement
1MBANDA INVESTMENT 28 1 975.180 0 / 28 R 0.00 partial
TOTAL (current selection)281975.1800 / 28R 0.00
Save Invoice · MBANDA INVESTMENTView Saved Invoices

0 already invoiced · 28 not yet invoiced · 28 still need pricing.

New uninvoiced tonnes
975.180 t
New invoice VAT
R 0.00
New invoice payable (partial until priced)
R 0.00

Save the remaining uninvoiced loads for 16–31 October 2024. Every saved invoice permanently captures the subcontractor, first/last transaction time, each ticket, its rate, VAT and totals. The normal statement still shows all transactions, including saved ones; only not-yet-invoiced loads are included in the new amount above.

Preview Current Statement
Automatic Train Pricing · MBANDA INVESTMENTVessels are manual
Set this once. When you open either payment period or the full month, new unpriced tickets carrying T9886, BT4534 or another explicit T/BT train reference automatically receive this saved train rate. Already-priced tickets keep their original saved rate. VS vessel tickets and unclear references always require manual pricing. All applied rates appear in the normal statement and Preview Invoice.
Vehicle Transactions, Pricing & Payments
1 registrations / groups · 28 completed loads
Tick the load checkboxes below to apply this rate only to those transactions (including previously priced loads). Apply to All covers this subcontractor's entire selected payment period, even other pages. Both options replace rates only for not-yet-invoiced tickets; saved invoice rates are locked. Select Unassign pricing to clear rates on uninvoiced loads.
0 loads selected on this page
Vehicle Registration Loads RECNO TRANNO Order No Source → Destination Material Nett Tons (t) Pricing / Rate (R per ton) Amount Incl VAT (R)
NPS86430 28 completed loads Load 1 310660 821952 —
Other / manual
CS5 → NORTH MSS 31.240
Not assigned
Not priced
—
Load 2 310679 821971 —
Other / manual
CS7 → NORTH MSS 36.680
Not assigned
Not priced
—
Load 3 310703 821995 —
Other / manual
CS7 → NORTH MSS 36.120
Not assigned
Not priced
—
Load 4 310992 822282 —
Other / manual
CS6 → NORTH MSS 31.140
Not assigned
Not priced
—
Load 5 311013 822303 —
Other / manual
CS6 → NORTH MSS 34.740
Not assigned
Not priced
—
Load 6 311035 822325 —
Other / manual
CS6 → NORTH MSS 34.600
Not assigned
Not priced
—
Load 7 311056 822346 —
Other / manual
CS7 → NORTH MSS 34.740
Not assigned
Not priced
—
Load 8 311078 822368 —
Other / manual
CS6 → NORTH MSS 37.540
Not assigned
Not priced
—
Load 9 311093 822383 —
Other / manual
CS6 → NORTH MSS 36.300
Not assigned
Not priced
—
Load 10 311108 822398 —
Other / manual
CS6 → NORTH MSS 33.880
Not assigned
Not priced
—
Load 11 311129 822419 —
Other / manual
CS6 → NORTH MSS 33.820
Not assigned
Not priced
—
Load 12 311151 822441 —
Other / manual
CS6 → NORTH MSS 34.260
Not assigned
Not priced
—
Load 13 311169 822459 —
Other / manual
CS6 → NORTH MSS 32.980
Not assigned
Not priced
—
Load 14 311187 822477 —
Other / manual
CS6 → NORTH MSS 33.640
Not assigned
Not priced
—
Load 15 311205 822495 —
Other / manual
CS6 → NORTH MSS 35.480
Not assigned
Not priced
—
Load 16 311219 822509 —
Other / manual
CS6 → NORTH MSS 34.640
Not assigned
Not priced
—
Load 17 311417 822707 —
Other / manual
CS2 → NORTH W4L40 35.380
Not assigned
Not priced
—
Load 18 311445 822735 —
Other / manual
CS2 → NORTH W4L40 35.900
Not assigned
Not priced
—
Load 19 311472 822762 —
Other / manual
CS2 → NORTH W4L40 34.940
Not assigned
Not priced
—
Load 20 311498 822788 —
Other / manual
CS2 → NORTH W4L40 36.720
Not assigned
Not priced
—
Load 21 311520 822810 —
Other / manual
CS2 → NORTH W4L40 35.040
Not assigned
Not priced
—
Load 22 311541 822831 —
Other / manual
CS2 → NORTH W4L40 35.200
Not assigned
Not priced
—
Load 23 311562 822852 —
Other / manual
CS2 → NORTH W4L40 33.480
Not assigned
Not priced
—
Load 24 312028 823318 —
Other / manual
BS1 → 20 SINTER 36.640
Not assigned
Not priced
—
Load 25 312070 823360 —
Other / manual
BS1 → 20 SINTER 36.720
Not assigned
Not priced
—
Load 26 312119 823409 —
Other / manual
BS1 → 20 SINTER 38.380
Not assigned
Not priced
—
Load 27 312164 823454 —
Other / manual
BS1 → 20 SINTER 32.800
Not assigned
Not priced
—
Load 28 312286 823576 —
Other / manual
BT0757 → 20 SINTER 32.180
Not assigned
Not priced
—
NPS86430 subtotal  ·  28 loads 975.180 0 / 28 priced R 0.00
GRAND TOTAL  ·  28 completed loads  ·  1 vehicles 975.180 t 0 priced / 28 unpriced R 0.00
eLOGIC · SUBCONTRACTOR PRICING

Assign Pricing to Unpriced Loads

MBANDA INVESTMENT · 16–31 October 2024

Unpriced loads28
Unpriced net tons975.180 t
Selected for pricing0 loads
Select Vehicle Registration RECNO TRANNO ORDERNO Source → Destination Nett Tons
NPS86430 310660 821952 — CS5 → NORTH 31.240
NPS86430 310679 821971 — CS7 → NORTH 36.680
NPS86430 310703 821995 — CS7 → NORTH 36.120
NPS86430 310992 822282 — CS6 → NORTH 31.140
NPS86430 311013 822303 — CS6 → NORTH 34.740
NPS86430 311035 822325 — CS6 → NORTH 34.600
NPS86430 311056 822346 — CS7 → NORTH 34.740
NPS86430 311078 822368 — CS6 → NORTH 37.540
NPS86430 311093 822383 — CS6 → NORTH 36.300
NPS86430 311108 822398 — CS6 → NORTH 33.880
NPS86430 311129 822419 — CS6 → NORTH 33.820
NPS86430 311151 822441 — CS6 → NORTH 34.260
NPS86430 311169 822459 — CS6 → NORTH 32.980
NPS86430 311187 822477 — CS6 → NORTH 33.640
NPS86430 311205 822495 — CS6 → NORTH 35.480
NPS86430 311219 822509 — CS6 → NORTH 34.640
NPS86430 311417 822707 — CS2 → NORTH 35.380
NPS86430 311445 822735 — CS2 → NORTH 35.900
NPS86430 311472 822762 — CS2 → NORTH 34.940
NPS86430 311498 822788 — CS2 → NORTH 36.720
NPS86430 311520 822810 — CS2 → NORTH 35.040
NPS86430 311541 822831 — CS2 → NORTH 35.200
NPS86430 311562 822852 — CS2 → NORTH 33.480
NPS86430 312028 823318 — BS1 → 20 36.640
NPS86430 312070 823360 — BS1 → 20 36.720
NPS86430 312119 823409 — BS1 → 20 38.380
NPS86430 312164 823454 — BS1 → 20 32.800
NPS86430 312286 823576 — BT0757 → 20 32.180
Pricing is per metric ton. Each priced load uses the upstream raw NETTWEIGHT converted from kilograms to metric tons (÷ 1,000), then multiplies by its saved subcontractor-rate snapshot, with VAT calculated per line and rounded to cents. VAT-inclusive rates are NOT charged VAT twice. Monetary totals sum priced loads only; 28 unpriced load(s) are excluded, so the amount is partial. This is a subcontractor settlement statement, not a tax invoice.
Saved ticket corrections applied: 0.
Statement validation: 2 period-dated transaction(s) excluded because NETTWEIGHT is zero/negative or missing; 0 API row(s) excluded because TRANDATETIME could not be read; 0 exact duplicate(s) ignored; 1,710 completed load(s) have no TRANSPORTER; 0 completed load(s) have no TRUCKNO.
One completed load is one transaction whose TRANDATETIME falls within the selected date range (both periods, one half-month, or a custom range within the selected calendar month) and whose NETTWEIGHT is greater than zero. Unique vehicle count is based on TRUCKNO; missing numbers are not counted as vehicles. Crysler and Buick NETTWEIGHT values are configured as kilograms and divided by 1,000 to metric tons before any summary or R/ton payment calculations; verify against the weighbridge slip. Train rate defaults are configured per subcontractor; new unpriced T/BT train loads receive the selected tariff, while VS vessel loads need manual pricing. Saved pricing is a R/ton subcontractor rate snapshot; it does not overwrite API data. Money is calculated to two decimals per load, including VAT per saved price settings. The selected payment statement remains provisional until its payment period ends. When all transporters are selected, unique vehicles are counted across the whole fleet; the same truck can appear under more than one transporter. Upstream transaction data is never changed; local pricing assignments are saved in MySQL.