Transporter Payment Statements

eLOGIC / WEIGHBRIDGE / FINANCIAL-MONTH REPORT

Transporter Payment Statement

UNPRICED POPUP ENABLED · KG → METRIC TONS · R/TON · VAT

16–31 October 2024 · 2024-10-16 to 2024-10-31 · STAN SHARP

Crysler: Connected Buick: Connected Transactions Audit Unpriced Audit Not Invoiced
Weight unit correction active. Raw Crysler and Buick API NETTWEIGHT is configured as kilograms and converted to metric tons (÷ 1,000) before calculating loads, statement tonnage and subcontractor payment. Previously displayed financial amounts were inflated because kilograms were treated as tons. Verify this configuration against an actual weighbridge slip before approving payments.
Show raw-weight-to-ton reconciliation (up to 5 loads)
WeighbridgeRECNOTRANNORaw NETTWEIGHT (kg)Converted (t)
Crysler 312144 823434 33,980.000 33.980
Crysler 312106 823396 32,160.000 32.160
Crysler 312067 823357 33,060.000 33.060
Crysler 312023 823313 29,800.000 29.800
Crysler 311780 823070 33,800.000 33.800
Statement Filters
Selected dates: 2024-10-16 through 2024-10-31 (inclusive)
Changes apply automatically. Both periods shows separate payment totals for each half of the month.
Completed Loads27
Vehicles Used1
Nett Tons (t)863.840
Selected dates2024-10-16 – 2024-10-31
Priced Loads0 / 27
Subcontractor Ex VATR 0.00
Subcontractor VATR 0.00
To Pay Incl VAT (partial)R 0.00
Saved Invoices / Already Invoiced Tickets Previously saved invoices and their exact ticket lists are always accessible, even without an API connection.
27 load(s) without pricing. Payable totals are partial until these loads are assigned.
Payment statement: 2024-10-16 through 2024-10-31 (inclusive)
eLOGIC / BLACKMAGIC
TRANSPORTER SUBCONTRACTOR PAYMENT STATEMENT

STAN SHARP

Completed weighbridge loads for the selected payment period
STATEMENT TS-202410-P2-8427FF2F 16–31 October 2024
Transporter / CompanySTAN SHARP
Statement Period16 Oct 2024 – 31 Oct 2024
Date Generated29 Nov 2026
Reporting PeriodCompleted payment period
Vehicles1
Completed Loads27
Total Nett Tons863.840 t
Subcontractor Ex VATR 0.00
VAT on Completed LoadsR 0.00
Payable Incl VAT (partial)R 0.00
Transporter Summary 50 transporter groups this payment period
#TransporterCompleted LoadsVehicles UsedNett Tons (t)Priced LoadsTo Pay Incl VATStatement
1STAN SHARP 27 1 863.840 0 / 27 R 0.00 partial
TOTAL (current selection)271863.8400 / 27R 0.00
Save Invoice · STAN SHARPView Saved Invoices

0 already invoiced · 27 not yet invoiced · 27 still need pricing.

New uninvoiced tonnes
863.840 t
New invoice VAT
R 0.00
New invoice payable (partial until priced)
R 0.00

Save the remaining uninvoiced loads for 16–31 October 2024. Every saved invoice permanently captures the subcontractor, first/last transaction time, each ticket, its rate, VAT and totals. The normal statement still shows all transactions, including saved ones; only not-yet-invoiced loads are included in the new amount above.

Preview Current Statement
Automatic Train Pricing · STAN SHARPVessels are manual
Set this once. When you open either payment period or the full month, new unpriced tickets carrying T9886, BT4534 or another explicit T/BT train reference automatically receive this saved train rate. Already-priced tickets keep their original saved rate. VS vessel tickets and unclear references always require manual pricing. All applied rates appear in the normal statement and Preview Invoice.
Vehicle Transactions, Pricing & Payments
1 registrations / groups · 27 completed loads
Tick the load checkboxes below to apply this rate only to those transactions (including previously priced loads). Apply to All covers this subcontractor's entire selected payment period, even other pages. Both options replace rates only for not-yet-invoiced tickets; saved invoice rates are locked. Select Unassign pricing to clear rates on uninvoiced loads.
0 loads selected on this page
Vehicle Registration Loads RECNO TRANNO Order No Source → Destination Material Nett Tons (t) Pricing / Rate (R per ton) Amount Incl VAT (R)
ESY018EC 27 completed loads Load 1 310724 822016 —
Other / manual
CS6 → NORTH MSS 28.880
Not assigned
Not priced
—
Load 2 310744 822036 —
Other / manual
CS6 → NORTH MSS 31.020
Not assigned
Not priced
—
Load 3 310779 822069 —
Other / manual
CS6 → NORTH MSS 34.580
Not assigned
Not priced
—
Load 4 310799 822089 —
Other / manual
CS6 → NORTH MSS 31.700
Not assigned
Not priced
—
Load 5 310820 822110 —
Other / manual
CS6 → NORTH MSS 31.060
Not assigned
Not priced
—
Load 6 310871 822161 —
Other / manual
CS6 → NORTH MSS 30.500
Not assigned
Not priced
—
Load 7 310894 822184 —
Other / manual
CS7 → NORTH MSS 32.340
Not assigned
Not priced
—
Load 8 310926 822216 —
Other / manual
CS6 → NORTH MSS 33.820
Not assigned
Not priced
—
Load 9 310952 822242 —
Other / manual
CS6 → NORTH MSS 32.780
Not assigned
Not priced
—
Load 10 311234 822524 —
Other / manual
CS7 → NORTH MSS 32.200
Not assigned
Not priced
—
Load 11 311262 822552 —
Other / manual
CS7 → NORTH MSS 30.280
Not assigned
Not priced
—
Load 12 311292 822582 —
Other / manual
BS1 → NORTH MSS 28.840
Not assigned
Not priced
—
Load 13 311323 822613 —
Other / manual
CS2 → NORTH W4L40 30.940
Not assigned
Not priced
—
Load 14 311351 822641 —
Other / manual
CS2 → NORTH W4L40 34.280
Not assigned
Not priced
—
Load 15 311375 822665 —
Other / manual
CS2 → NORTH W4L40 32.640
Not assigned
Not priced
—
Load 16 311581 822871 —
Other / manual
CS2 → NORTH W4L40 32.380
Not assigned
Not priced
—
Load 17 311613 822903 —
Other / manual
CS2 → NORTH W4L40 34.240
Not assigned
Not priced
—
Load 18 311641 822931 —
Other / manual
CS2 → NORTH W4L40 31.760
Not assigned
Not priced
—
Load 19 311671 822961 —
Other / manual
CS2 → NORTH W4L40 32.620
Not assigned
Not priced
—
Load 20 311702 822992 —
Other / manual
CS2 → NORTH W4L40 32.680
Not assigned
Not priced
—
Load 21 311725 823015 —
Other / manual
CS3 → NORTH W4L40 30.720
Not assigned
Not priced
—
Load 22 311745 823035 —
Other / manual
CS3 → NORTH W4L40 30.780
Not assigned
Not priced
—
Load 23 311780 823070 —
Other / manual
CS3 → NORTH W4L40 33.800
Not assigned
Not priced
—
Load 24 312023 823313 —
Other / manual
BS1 → 20 SINTER 29.800
Not assigned
Not priced
—
Load 25 312067 823357 —
Other / manual
BS1 → 20 SINTER 33.060
Not assigned
Not priced
—
Load 26 312106 823396 —
Other / manual
BS1 → 20 SINTER 32.160
Not assigned
Not priced
—
Load 27 312144 823434 —
Other / manual
BS1 → 20 SINTER 33.980
Not assigned
Not priced
—
ESY018EC subtotal  ·  27 loads 863.840 0 / 27 priced R 0.00
GRAND TOTAL  ·  27 completed loads  ·  1 vehicles 863.840 t 0 priced / 27 unpriced R 0.00
eLOGIC · SUBCONTRACTOR PRICING

Assign Pricing to Unpriced Loads

STAN SHARP · 16–31 October 2024

Unpriced loads27
Unpriced net tons863.840 t
Selected for pricing0 loads
Select Vehicle Registration RECNO TRANNO ORDERNO Source → Destination Nett Tons
ESY018EC 310724 822016 — CS6 → NORTH 28.880
ESY018EC 310744 822036 — CS6 → NORTH 31.020
ESY018EC 310779 822069 — CS6 → NORTH 34.580
ESY018EC 310799 822089 — CS6 → NORTH 31.700
ESY018EC 310820 822110 — CS6 → NORTH 31.060
ESY018EC 310871 822161 — CS6 → NORTH 30.500
ESY018EC 310894 822184 — CS7 → NORTH 32.340
ESY018EC 310926 822216 — CS6 → NORTH 33.820
ESY018EC 310952 822242 — CS6 → NORTH 32.780
ESY018EC 311234 822524 — CS7 → NORTH 32.200
ESY018EC 311262 822552 — CS7 → NORTH 30.280
ESY018EC 311292 822582 — BS1 → NORTH 28.840
ESY018EC 311323 822613 — CS2 → NORTH 30.940
ESY018EC 311351 822641 — CS2 → NORTH 34.280
ESY018EC 311375 822665 — CS2 → NORTH 32.640
ESY018EC 311581 822871 — CS2 → NORTH 32.380
ESY018EC 311613 822903 — CS2 → NORTH 34.240
ESY018EC 311641 822931 — CS2 → NORTH 31.760
ESY018EC 311671 822961 — CS2 → NORTH 32.620
ESY018EC 311702 822992 — CS2 → NORTH 32.680
ESY018EC 311725 823015 — CS3 → NORTH 30.720
ESY018EC 311745 823035 — CS3 → NORTH 30.780
ESY018EC 311780 823070 — CS3 → NORTH 33.800
ESY018EC 312023 823313 — BS1 → 20 29.800
ESY018EC 312067 823357 — BS1 → 20 33.060
ESY018EC 312106 823396 — BS1 → 20 32.160
ESY018EC 312144 823434 — BS1 → 20 33.980
Pricing is per metric ton. Each priced load uses the upstream raw NETTWEIGHT converted from kilograms to metric tons (÷ 1,000), then multiplies by its saved subcontractor-rate snapshot, with VAT calculated per line and rounded to cents. VAT-inclusive rates are NOT charged VAT twice. Monetary totals sum priced loads only; 27 unpriced load(s) are excluded, so the amount is partial. This is a subcontractor settlement statement, not a tax invoice.
Saved ticket corrections applied: 0.
Statement validation: 2 period-dated transaction(s) excluded because NETTWEIGHT is zero/negative or missing; 0 API row(s) excluded because TRANDATETIME could not be read; 0 exact duplicate(s) ignored; 1,710 completed load(s) have no TRANSPORTER; 0 completed load(s) have no TRUCKNO.
One completed load is one transaction whose TRANDATETIME falls within the selected date range (both periods, one half-month, or a custom range within the selected calendar month) and whose NETTWEIGHT is greater than zero. Unique vehicle count is based on TRUCKNO; missing numbers are not counted as vehicles. Crysler and Buick NETTWEIGHT values are configured as kilograms and divided by 1,000 to metric tons before any summary or R/ton payment calculations; verify against the weighbridge slip. Train rate defaults are configured per subcontractor; new unpriced T/BT train loads receive the selected tariff, while VS vessel loads need manual pricing. Saved pricing is a R/ton subcontractor rate snapshot; it does not overwrite API data. Money is calculated to two decimals per load, including VAT per saved price settings. The selected payment statement remains provisional until its payment period ends. When all transporters are selected, unique vehicles are counted across the whole fleet; the same truck can appear under more than one transporter. Upstream transaction data is never changed; local pricing assignments are saved in MySQL.