Transporter Payment Statements

eLOGIC / WEIGHBRIDGE / FINANCIAL-MONTH REPORT

Transporter Payment Statement

UNPRICED POPUP ENABLED · KG → METRIC TONS · R/TON · VAT

1–15 November 2024 · 2024-11-01 to 2024-11-15 · MBOYI HOLDINGS

Crysler: Connected Buick: Connected Transactions Audit Unpriced Audit Not Invoiced
Weight unit correction active. Raw Crysler and Buick API NETTWEIGHT is configured as kilograms and converted to metric tons (÷ 1,000) before calculating loads, statement tonnage and subcontractor payment. Previously displayed financial amounts were inflated because kilograms were treated as tons. Verify this configuration against an actual weighbridge slip before approving payments.
Show raw-weight-to-ton reconciliation (up to 5 loads)
WeighbridgeRECNOTRANNORaw NETTWEIGHT (kg)Converted (t)
Crysler 317575 826865 34,300.000 34.300
Crysler 317546 826836 35,720.000 35.720
Crysler 317518 826808 31,780.000 31.780
Crysler 317495 826785 34,120.000 34.120
Crysler 317454 826744 33,820.000 33.820
Statement Filters
Selected dates: 2024-11-01 through 2024-11-15 (inclusive)
Changes apply automatically. Both periods shows separate payment totals for each half of the month.
Completed Loads40
Vehicles Used1
Nett Tons (t)1,371.560
Selected dates2024-11-01 – 2024-11-15
Priced Loads0 / 40
Subcontractor Ex VATR 0.00
Subcontractor VATR 0.00
To Pay Incl VAT (partial)R 0.00
Saved Invoices / Already Invoiced Tickets Previously saved invoices and their exact ticket lists are always accessible, even without an API connection.
40 load(s) without pricing. Payable totals are partial until these loads are assigned.
Payment statement: 2024-11-01 through 2024-11-15 (inclusive)
eLOGIC / BLACKMAGIC
TRANSPORTER SUBCONTRACTOR PAYMENT STATEMENT

MBOYI HOLDINGS

Completed weighbridge loads for the selected payment period
STATEMENT TS-202411-P1-0CE8E3EC 1–15 November 2024
Transporter / CompanyMBOYI HOLDINGS
Statement Period01 Nov 2024 – 15 Nov 2024
Date Generated30 Nov 2026
Reporting PeriodCompleted payment period
Vehicles1
Completed Loads40
Total Nett Tons1,371.560 t
Subcontractor Ex VATR 0.00
VAT on Completed LoadsR 0.00
Payable Incl VAT (partial)R 0.00
Transporter Summary 49 transporter groups this payment period
#TransporterCompleted LoadsVehicles UsedNett Tons (t)Priced LoadsTo Pay Incl VATStatement
1MBOYI HOLDINGS 40 1 1,371.560 0 / 40 R 0.00 partial
TOTAL (current selection)4011,371.5600 / 40R 0.00
Save Invoice · MBOYI HOLDINGSView Saved Invoices

0 already invoiced · 40 not yet invoiced · 40 still need pricing.

New uninvoiced tonnes
1,371.560 t
New invoice VAT
R 0.00
New invoice payable (partial until priced)
R 0.00

Save the remaining uninvoiced loads for 1–15 November 2024. Every saved invoice permanently captures the subcontractor, first/last transaction time, each ticket, its rate, VAT and totals. The normal statement still shows all transactions, including saved ones; only not-yet-invoiced loads are included in the new amount above.

Preview Current Statement
Automatic Train Pricing · MBOYI HOLDINGSVessels are manual
Set this once. When you open either payment period or the full month, new unpriced tickets carrying T9886, BT4534 or another explicit T/BT train reference automatically receive this saved train rate. Already-priced tickets keep their original saved rate. VS vessel tickets and unclear references always require manual pricing. All applied rates appear in the normal statement and Preview Invoice.
Vehicle Transactions, Pricing & Payments
1 registrations / groups · 40 completed loads
Tick the load checkboxes below to apply this rate only to those transactions (including previously priced loads). Apply to All covers this subcontractor's entire selected payment period, even other pages. Both options replace rates only for not-yet-invoiced tickets; saved invoice rates are locked. Select Unassign pricing to clear rates on uninvoiced loads.
0 loads selected on this page
Vehicle Registration Loads RECNO TRANNO Order No Source → Destination Material Nett Tons (t) Pricing / Rate (R per ton) Amount Incl VAT (R)
JVP037EC 40 completed loads Load 1 316109 825400 —
Other / manual
CS3 → MACKE W4L40 34.720
Not assigned
Not priced
—
Load 2 316145 825436 —
Other / manual
CS2 → MACKE W4L40 32.460
Not assigned
Not priced
—
Load 3 316181 825472 —
Other / manual
CS2 → MACKE W4L40 37.180
Not assigned
Not priced
—
Load 4 316216 825507 —
Other / manual
CS3 → MACKE W4L40 37.440
Not assigned
Not priced
—
Load 5 316268 825559 —
Other / manual
CS2 → MACKE W4L40 33.780
Not assigned
Not priced
—
Load 6 316309 825600 —
Other / manual
CS3 → MACKE W4L40 34.040
Not assigned
Not priced
—
Load 7 316327 825618 —
Other / manual
CS3 → MACKE W4L40 35.800
Not assigned
Not priced
—
Load 8 316346 825637 —
Other / manual
CS3 → MACKE W4L40 36.480
Not assigned
Not priced
—
Load 9 316366 825657 —
Other / manual
CS3 → MACKE W4L40 35.480
Not assigned
Not priced
—
Load 10 316385 825676 —
Other / manual
CS3 → MACKE DX2076 35.300
Not assigned
Not priced
—
Load 11 316404 825695 —
Other / manual
CS3 → MACKE W4L40 35.480
Not assigned
Not priced
—
Load 12 316437 825728 —
Other / manual
CS3 → MACKE W4L40 32.800
Not assigned
Not priced
—
Load 13 316464 825755 —
Other / manual
CS3 → MACKE W4L40 31.700
Not assigned
Not priced
—
Load 14 316494 825785 —
Other / manual
CS3 → MACKE W4L40 34.520
Not assigned
Not priced
—
Load 15 316539 825830 —
Other / manual
CS3 → MACKE W4L40 34.940
Not assigned
Not priced
—
Load 16 316570 825861 —
Other / manual
CS3 → MACKE W4L40 35.220
Not assigned
Not priced
—
Load 17 316595 825886 —
Other / manual
CS3 → MACKE W4L40 34.960
Not assigned
Not priced
—
Load 18 316620 825911 —
Other / manual
CS3 → MACKE W4L40 34.620
Not assigned
Not priced
—
Load 19 316667 825958 —
Other / manual
CS3 → MACKE W4L40 34.280
Not assigned
Not priced
—
Load 20 316704 825995 —
Other / manual
CS3 → MACKE W4L40 34.160
Not assigned
Not priced
—
Load 21 316741 826032 —
Other / manual
CS3 → MACKE W4L40 34.160
Not assigned
Not priced
—
Load 22 316943 826234 —
Other / manual
CS5 → TRIUMP M1L 35.860
Not assigned
Not priced
—
Load 23 316979 826270 —
Other / manual
CS5 → TRIUMP M1L 33.980
Not assigned
Not priced
—
Load 24 317016 826307 —
Other / manual
CS6 → TRIUMP M1L 32.400
Not assigned
Not priced
—
Load 25 317048 826339 —
Other / manual
CS4 → TRIUMP M1L 33.660
Not assigned
Not priced
—
Load 26 317085 826376 —
Other / manual
CS4 → TRIUMP M1L 34.340
Not assigned
Not priced
—
Load 27 317127 826418 —
Other / manual
CS5 → TRIUMP M1L 36.920
Not assigned
Not priced
—
Load 28 317195 826486 —
Other / manual
CS5 → TRIUMP M1L 32.680
Not assigned
Not priced
—
Load 29 317220 826511 —
Other / manual
CS6 → TRIUMP M1L 30.780
Not assigned
Not priced
—
Load 30 317249 826540 —
Other / manual
CS6 → TRIUMP M1L 33.380
Not assigned
Not priced
—
Load 31 317307 826598 —
Other / manual
CS3 → TRIUMP W4L40 32.420
Not assigned
Not priced
—
Load 32 317336 826627 —
Other / manual
CS2 → TRIUMP W4L40 34.440
Not assigned
Not priced
—
Load 33 317375 826666 —
Other / manual
CS2 → TRIUMP W4L40 34.780
Not assigned
Not priced
—
Load 34 317402 826693 —
Other / manual
CS8 → TRIUMP W4L40 34.600
Not assigned
Not priced
—
Load 35 317429 826720 —
Other / manual
CS8 → TRIUMP W4L40 32.060
Not assigned
Not priced
—
Load 36 317454 826744 —
Other / manual
CS3 → TRIUMP W4L40 33.820
Not assigned
Not priced
—
Load 37 317495 826785 —
Other / manual
CS8 → TRIUMP W4L40 34.120
Not assigned
Not priced
—
Load 38 317518 826808 —
Other / manual
CS3 → TRIUMP W4L40 31.780
Not assigned
Not priced
—
Load 39 317546 826836 —
Other / manual
CS2 → TRIUMP W4L40 35.720
Not assigned
Not priced
—
Load 40 317575 826865 —
Other / manual
CS2 → TRIUMP W4L40 34.300
Not assigned
Not priced
—
JVP037EC subtotal  ·  40 loads 1,371.560 0 / 40 priced R 0.00
GRAND TOTAL  ·  40 completed loads  ·  1 vehicles 1,371.560 t 0 priced / 40 unpriced R 0.00
eLOGIC · SUBCONTRACTOR PRICING

Assign Pricing to Unpriced Loads

MBOYI HOLDINGS · 1–15 November 2024

Unpriced loads40
Unpriced net tons1,371.560 t
Selected for pricing0 loads
Select Vehicle Registration RECNO TRANNO ORDERNO Source → Destination Nett Tons
JVP037EC 316109 825400 — CS3 → MACKE 34.720
JVP037EC 316145 825436 — CS2 → MACKE 32.460
JVP037EC 316181 825472 — CS2 → MACKE 37.180
JVP037EC 316216 825507 — CS3 → MACKE 37.440
JVP037EC 316268 825559 — CS2 → MACKE 33.780
JVP037EC 316309 825600 — CS3 → MACKE 34.040
JVP037EC 316327 825618 — CS3 → MACKE 35.800
JVP037EC 316346 825637 — CS3 → MACKE 36.480
JVP037EC 316366 825657 — CS3 → MACKE 35.480
JVP037EC 316385 825676 — CS3 → MACKE 35.300
JVP037EC 316404 825695 — CS3 → MACKE 35.480
JVP037EC 316437 825728 — CS3 → MACKE 32.800
JVP037EC 316464 825755 — CS3 → MACKE 31.700
JVP037EC 316494 825785 — CS3 → MACKE 34.520
JVP037EC 316539 825830 — CS3 → MACKE 34.940
JVP037EC 316570 825861 — CS3 → MACKE 35.220
JVP037EC 316595 825886 — CS3 → MACKE 34.960
JVP037EC 316620 825911 — CS3 → MACKE 34.620
JVP037EC 316667 825958 — CS3 → MACKE 34.280
JVP037EC 316704 825995 — CS3 → MACKE 34.160
JVP037EC 316741 826032 — CS3 → MACKE 34.160
JVP037EC 316943 826234 — CS5 → TRIUMP 35.860
JVP037EC 316979 826270 — CS5 → TRIUMP 33.980
JVP037EC 317016 826307 — CS6 → TRIUMP 32.400
JVP037EC 317048 826339 — CS4 → TRIUMP 33.660
JVP037EC 317085 826376 — CS4 → TRIUMP 34.340
JVP037EC 317127 826418 — CS5 → TRIUMP 36.920
JVP037EC 317195 826486 — CS5 → TRIUMP 32.680
JVP037EC 317220 826511 — CS6 → TRIUMP 30.780
JVP037EC 317249 826540 — CS6 → TRIUMP 33.380
JVP037EC 317307 826598 — CS3 → TRIUMP 32.420
JVP037EC 317336 826627 — CS2 → TRIUMP 34.440
JVP037EC 317375 826666 — CS2 → TRIUMP 34.780
JVP037EC 317402 826693 — CS8 → TRIUMP 34.600
JVP037EC 317429 826720 — CS8 → TRIUMP 32.060
JVP037EC 317454 826744 — CS3 → TRIUMP 33.820
JVP037EC 317495 826785 — CS8 → TRIUMP 34.120
JVP037EC 317518 826808 — CS3 → TRIUMP 31.780
JVP037EC 317546 826836 — CS2 → TRIUMP 35.720
JVP037EC 317575 826865 — CS2 → TRIUMP 34.300
Pricing is per metric ton. Each priced load uses the upstream raw NETTWEIGHT converted from kilograms to metric tons (÷ 1,000), then multiplies by its saved subcontractor-rate snapshot, with VAT calculated per line and rounded to cents. VAT-inclusive rates are NOT charged VAT twice. Monetary totals sum priced loads only; 40 unpriced load(s) are excluded, so the amount is partial. This is a subcontractor settlement statement, not a tax invoice.
Saved ticket corrections applied: 0.
Statement validation: 3 period-dated transaction(s) excluded because NETTWEIGHT is zero/negative or missing; 0 API row(s) excluded because TRANDATETIME could not be read; 0 exact duplicate(s) ignored; 1,585 completed load(s) have no TRANSPORTER; 0 completed load(s) have no TRUCKNO.
One completed load is one transaction whose TRANDATETIME falls within the selected date range (both periods, one half-month, or a custom range within the selected calendar month) and whose NETTWEIGHT is greater than zero. Unique vehicle count is based on TRUCKNO; missing numbers are not counted as vehicles. Crysler and Buick NETTWEIGHT values are configured as kilograms and divided by 1,000 to metric tons before any summary or R/ton payment calculations; verify against the weighbridge slip. Train rate defaults are configured per subcontractor; new unpriced T/BT train loads receive the selected tariff, while VS vessel loads need manual pricing. Saved pricing is a R/ton subcontractor rate snapshot; it does not overwrite API data. Money is calculated to two decimals per load, including VAT per saved price settings. The selected payment statement remains provisional until its payment period ends. When all transporters are selected, unique vehicles are counted across the whole fleet; the same truck can appear under more than one transporter. Upstream transaction data is never changed; local pricing assignments are saved in MySQL.