Crysler: Connected Buick: Connected Transactions Audit Unpriced Audit Not Invoiced
Weight unit correction active. Raw Crysler and Buick API NETTWEIGHT is configured as kilograms and converted to metric tons (÷ 1,000) before calculating loads, statement tonnage and subcontractor payment. Previously displayed financial amounts were inflated because kilograms were treated as tons. Verify this configuration against an actual weighbridge slip before approving payments.
Show raw-weight-to-ton reconciliation (up to 5 loads)
WeighbridgeRECNOTRANNORaw NETTWEIGHT (kg)Converted (t)
Crysler 327284 831622 34,980.000 34.980
Crysler 327171 831509 34,000.000 34.000
Crysler 327135 831473 36,100.000 36.100
Crysler 327099 831437 37,240.000 37.240
Crysler 327064 831402 35,960.000 35.960
Statement Filters
Selected dates: 2024-12-16 through 2024-12-31 (inclusive)
Changes apply automatically. Both periods shows separate payment totals for each half of the month.
Completed Loads28
Vehicles Used1
Nett Tons (t)962.800
Selected dates2024-12-16 – 2024-12-31
Priced Loads0 / 28
Subcontractor Ex VATR 0.00
Subcontractor VATR 0.00
To Pay Incl VAT (partial)R 0.00
Saved Invoices / Already Invoiced Tickets Previously saved invoices and their exact ticket lists are always accessible, even without an API connection.
28 load(s) without pricing. Payable totals are partial until these loads are assigned.
Payment statement: 2024-12-16 through 2024-12-31 (inclusive)
eLOGIC / BLACKMAGIC
TRANSPORTER SUBCONTRACTOR PAYMENT STATEMENT

MBOYI HOLDINGS

Completed weighbridge loads for the selected payment period
STATEMENT TS-202412-P2-0CE8E3EC 16–31 December 2024
Transporter / CompanyMBOYI HOLDINGS
Statement Period16 Dec 2024 – 31 Dec 2024
Date Generated29 Nov 2026
Reporting PeriodCompleted payment period
Vehicles1
Completed Loads28
Total Nett Tons962.800 t
Subcontractor Ex VATR 0.00
VAT on Completed LoadsR 0.00
Payable Incl VAT (partial)R 0.00
Transporter Summary 45 transporter groups this payment period
#TransporterCompleted LoadsVehicles UsedNett Tons (t)Priced LoadsTo Pay Incl VATStatement
1MBOYI HOLDINGS 28 1 962.800 0 / 28 R 0.00 partial
TOTAL (current selection)281962.8000 / 28R 0.00
Save Invoice · MBOYI HOLDINGSView Saved Invoices

0 already invoiced · 28 not yet invoiced · 28 still need pricing.

New uninvoiced tonnes
962.800 t
New invoice VAT
R 0.00
New invoice payable (partial until priced)
R 0.00

Save the remaining uninvoiced loads for 16–31 December 2024. Every saved invoice permanently captures the subcontractor, first/last transaction time, each ticket, its rate, VAT and totals. The normal statement still shows all transactions, including saved ones; only not-yet-invoiced loads are included in the new amount above.

Preview Current Statement
Automatic Train Pricing · MBOYI HOLDINGSVessels are manual
Set this once. When you open either payment period or the full month, new unpriced tickets carrying T9886, BT4534 or another explicit T/BT train reference automatically receive this saved train rate. Already-priced tickets keep their original saved rate. VS vessel tickets and unclear references always require manual pricing. All applied rates appear in the normal statement and Preview Invoice.
Vehicle Transactions, Pricing & Payments
1 registrations / groups · 28 completed loads
Tick the load checkboxes below to apply this rate only to those transactions (including previously priced loads). Apply to All covers this subcontractor's entire selected payment period, even other pages. Both options replace rates only for not-yet-invoiced tickets; saved invoice rates are locked. Select Unassign pricing to clear rates on uninvoiced loads.
0 loads selected on this page
Vehicle Registration Loads RECNO TRANNO Order No Source → Destination Material Nett Tons (t) Pricing / Rate (R per ton) Amount Incl VAT (R)
JVP037EC 28 completed loads Load 1 326224 830563 —
Other / manual
CS5 → BBG M1L 36.200
Not assigned
Not priced
—
Load 2 326249 830588 —
Other / manual
CS1 → BBG M1L 32.800
Not assigned
Not priced
—
Load 3 326280 830619 —
Other / manual
CS1 → BBG M1L 34.240
Not assigned
Not priced
—
Load 4 326314 830653 —
Other / manual
CS1 → BBG M1L 33.300
Not assigned
Not priced
—
Load 5 326344 830683 —
Other / manual
CS5 → BBG M1L 32.920
Not assigned
Not priced
—
Load 6 326368 830707 —
Other / manual
CS5 → BBG M1L 36.260
Not assigned
Not priced
—
Load 7 326382 830721 —
Other / manual
CS5 → BBG M1L 33.140
Not assigned
Not priced
—
Load 8 326398 830737 —
Other / manual
CS5 → BBG M1L 34.660
Not assigned
Not priced
—
Load 9 326412 830751 —
Other / manual
CS4 → BBG M1L 34.880
Not assigned
Not priced
—
Load 10 326424 830763 —
Other / manual
CS4 → BBG M1L 34.200
Not assigned
Not priced
—
Load 11 326434 830773 —
Other / manual
CS5 → BBG M1L 33.400
Not assigned
Not priced
—
Load 12 326490 830829 —
Other / manual
CS2 → DIMI W4L40 35.360
Not assigned
Not priced
—
Load 13 326531 830870 —
Other / manual
CS2 → DIMI W4L40 34.840
Not assigned
Not priced
—
Load 14 326575 830913 —
Other / manual
CS1 → DIMI W4L40 38.560
Not assigned
Not priced
—
Load 15 326612 830950 —
Other / manual
CS2 → DIMI MSS 36.300
Not assigned
Not priced
—
Load 16 326671 831009 —
Other / manual
CS2 → DIMI W4L40 33.700
Not assigned
Not priced
—
Load 17 326810 831148 —
Other / manual
CS8 → BBG MSS 32.660
Not assigned
Not priced
—
Load 18 326844 831182 —
Other / manual
CS8 → BBG MSS 30.480
Not assigned
Not priced
—
Load 19 326873 831211 —
Other / manual
CS7 → BBG MSS 34.340
Not assigned
Not priced
—
Load 20 326908 831246 —
Other / manual
CS7 → BBG MSS 32.840
Not assigned
Not priced
—
Load 21 326938 831276 —
Other / manual
CS7 → BBG MSS 32.140
Not assigned
Not priced
—
Load 22 326966 831304 —
Other / manual
CS7 → BBG MSS 32.800
Not assigned
Not priced
—
Load 23 327036 831374 —
Other / manual
CS3 → SEPTE W4L40 34.500
Not assigned
Not priced
—
Load 24 327064 831402 —
Other / manual
CS3 → SEPTE W4L40 35.960
Not assigned
Not priced
—
Load 25 327099 831437 —
Other / manual
CS3 → SEPTE W4L40 37.240
Not assigned
Not priced
—
Load 26 327135 831473 —
Other / manual
CS2 → SEPTE W4L40 36.100
Not assigned
Not priced
—
Load 27 327171 831509 —
Other / manual
CS2 → SEPTE W4L40 34.000
Not assigned
Not priced
—
Load 28 327284 831622 —
Other / manual
CS2 → SEPTE W4L40 34.980
Not assigned
Not priced
—
JVP037EC subtotal  ·  28 loads 962.800 0 / 28 priced R 0.00
GRAND TOTAL  ·  28 completed loads  ·  1 vehicles 962.800 t 0 priced / 28 unpriced R 0.00
eLOGIC · SUBCONTRACTOR PRICING

Assign Pricing to Unpriced Loads

MBOYI HOLDINGS · 16–31 December 2024

Unpriced loads28
Unpriced net tons962.800 t
Selected for pricing0 loads
Select Vehicle Registration RECNO TRANNO ORDERNO Source → Destination Nett Tons
JVP037EC 326224 830563 — CS5 → BBG 36.200
JVP037EC 326249 830588 — CS1 → BBG 32.800
JVP037EC 326280 830619 — CS1 → BBG 34.240
JVP037EC 326314 830653 — CS1 → BBG 33.300
JVP037EC 326344 830683 — CS5 → BBG 32.920
JVP037EC 326368 830707 — CS5 → BBG 36.260
JVP037EC 326382 830721 — CS5 → BBG 33.140
JVP037EC 326398 830737 — CS5 → BBG 34.660
JVP037EC 326412 830751 — CS4 → BBG 34.880
JVP037EC 326424 830763 — CS4 → BBG 34.200
JVP037EC 326434 830773 — CS5 → BBG 33.400
JVP037EC 326490 830829 — CS2 → DIMI 35.360
JVP037EC 326531 830870 — CS2 → DIMI 34.840
JVP037EC 326575 830913 — CS1 → DIMI 38.560
JVP037EC 326612 830950 — CS2 → DIMI 36.300
JVP037EC 326671 831009 — CS2 → DIMI 33.700
JVP037EC 326810 831148 — CS8 → BBG 32.660
JVP037EC 326844 831182 — CS8 → BBG 30.480
JVP037EC 326873 831211 — CS7 → BBG 34.340
JVP037EC 326908 831246 — CS7 → BBG 32.840
JVP037EC 326938 831276 — CS7 → BBG 32.140
JVP037EC 326966 831304 — CS7 → BBG 32.800
JVP037EC 327036 831374 — CS3 → SEPTE 34.500
JVP037EC 327064 831402 — CS3 → SEPTE 35.960
JVP037EC 327099 831437 — CS3 → SEPTE 37.240
JVP037EC 327135 831473 — CS2 → SEPTE 36.100
JVP037EC 327171 831509 — CS2 → SEPTE 34.000
JVP037EC 327284 831622 — CS2 → SEPTE 34.980
Pricing is per metric ton. Each priced load uses the upstream raw NETTWEIGHT converted from kilograms to metric tons (÷ 1,000), then multiplies by its saved subcontractor-rate snapshot, with VAT calculated per line and rounded to cents. VAT-inclusive rates are NOT charged VAT twice. Monetary totals sum priced loads only; 28 unpriced load(s) are excluded, so the amount is partial. This is a subcontractor settlement statement, not a tax invoice.
Saved ticket corrections applied: 0.
Statement validation: 2 period-dated transaction(s) excluded because NETTWEIGHT is zero/negative or missing; 0 API row(s) excluded because TRANDATETIME could not be read; 0 exact duplicate(s) ignored; 1,247 completed load(s) have no TRANSPORTER; 0 completed load(s) have no TRUCKNO.
One completed load is one transaction whose TRANDATETIME falls within the selected date range (both periods, one half-month, or a custom range within the selected calendar month) and whose NETTWEIGHT is greater than zero. Unique vehicle count is based on TRUCKNO; missing numbers are not counted as vehicles. Crysler and Buick NETTWEIGHT values are configured as kilograms and divided by 1,000 to metric tons before any summary or R/ton payment calculations; verify against the weighbridge slip. Train rate defaults are configured per subcontractor; new unpriced T/BT train loads receive the selected tariff, while VS vessel loads need manual pricing. Saved pricing is a R/ton subcontractor rate snapshot; it does not overwrite API data. Money is calculated to two decimals per load, including VAT per saved price settings. The selected payment statement remains provisional until its payment period ends. When all transporters are selected, unique vehicles are counted across the whole fleet; the same truck can appear under more than one transporter. Upstream transaction data is never changed; local pricing assignments are saved in MySQL.