Transporter Payment Statements

eLOGIC / WEIGHBRIDGE / FINANCIAL-MONTH REPORT

Transporter Payment Statement

UNPRICED POPUP ENABLED · KG → METRIC TONS · R/TON · VAT

16–31 December 2024 · 2024-12-16 to 2024-12-31 · TJS HARBILY

Crysler: Connected Buick: Connected Transactions Audit Unpriced Audit Not Invoiced
Weight unit correction active. Raw Crysler and Buick API NETTWEIGHT is configured as kilograms and converted to metric tons (÷ 1,000) before calculating loads, statement tonnage and subcontractor payment. Previously displayed financial amounts were inflated because kilograms were treated as tons. Verify this configuration against an actual weighbridge slip before approving payments.
Show raw-weight-to-ton reconciliation (up to 5 loads)
WeighbridgeRECNOTRANNORaw NETTWEIGHT (kg)Converted (t)
Crysler 327657 831995 35,220.000 35.220
Crysler 327553 831891 36,960.000 36.960
Crysler 327543 831881 35,260.000 35.260
Crysler 327524 831862 36,560.000 36.560
Crysler 327517 831855 35,880.000 35.880
Statement Filters
Selected dates: 2024-12-16 through 2024-12-31 (inclusive)
Changes apply automatically. Both periods shows separate payment totals for each half of the month.
Completed Loads54
Vehicles Used2
Nett Tons (t)1,856.540
Selected dates2024-12-16 – 2024-12-31
Priced Loads0 / 54
Subcontractor Ex VATR 0.00
Subcontractor VATR 0.00
To Pay Incl VAT (partial)R 0.00
Saved Invoices / Already Invoiced Tickets Previously saved invoices and their exact ticket lists are always accessible, even without an API connection.
54 load(s) without pricing. Payable totals are partial until these loads are assigned.
Payment statement: 2024-12-16 through 2024-12-31 (inclusive)
eLOGIC / BLACKMAGIC
TRANSPORTER SUBCONTRACTOR PAYMENT STATEMENT

TJS HARBILY

Completed weighbridge loads for the selected payment period
STATEMENT TS-202412-P2-4302AB20 16–31 December 2024
Transporter / CompanyTJS HARBILY
Statement Period16 Dec 2024 – 31 Dec 2024
Date Generated29 Nov 2026
Reporting PeriodCompleted payment period
Vehicles2
Completed Loads54
Total Nett Tons1,856.540 t
Subcontractor Ex VATR 0.00
VAT on Completed LoadsR 0.00
Payable Incl VAT (partial)R 0.00
Transporter Summary 45 transporter groups this payment period
#TransporterCompleted LoadsVehicles UsedNett Tons (t)Priced LoadsTo Pay Incl VATStatement
1TJS HARBILY 54 2 1,856.540 0 / 54 R 0.00 partial
TOTAL (current selection)5421,856.5400 / 54R 0.00
Save Invoice · TJS HARBILYView Saved Invoices

0 already invoiced · 54 not yet invoiced · 54 still need pricing.

New uninvoiced tonnes
1,856.540 t
New invoice VAT
R 0.00
New invoice payable (partial until priced)
R 0.00

Save the remaining uninvoiced loads for 16–31 December 2024. Every saved invoice permanently captures the subcontractor, first/last transaction time, each ticket, its rate, VAT and totals. The normal statement still shows all transactions, including saved ones; only not-yet-invoiced loads are included in the new amount above.

Preview Current Statement
Automatic Train Pricing · TJS HARBILYVessels are manual
Set this once. When you open either payment period or the full month, new unpriced tickets carrying T9886, BT4534 or another explicit T/BT train reference automatically receive this saved train rate. Already-priced tickets keep their original saved rate. VS vessel tickets and unclear references always require manual pricing. All applied rates appear in the normal statement and Preview Invoice.
Vehicle Transactions, Pricing & Payments
2 registrations / groups · 54 completed loads
Tick the load checkboxes below to apply this rate only to those transactions (including previously priced loads). Apply to All covers this subcontractor's entire selected payment period, even other pages. Both options replace rates only for not-yet-invoiced tickets; saved invoice rates are locked. Select Unassign pricing to clear rates on uninvoiced loads.
0 loads selected on this page
Vehicle Registration Loads RECNO TRANNO Order No Source → Destination Material Nett Tons (t) Pricing / Rate (R per ton) Amount Incl VAT (R)
KFM745EC 38 completed loads Load 1 326218 830557 —
Other / manual
CS5 → BBG M1L 35.840
Not assigned
Not priced
—
Load 2 326248 830587 —
Other / manual
CS1 → BBG M1L 36.140
Not assigned
Not priced
—
Load 3 326279 830618 —
Other / manual
CS1 → BBG M1L 35.520
Not assigned
Not priced
—
Load 4 326313 830652 —
Other / manual
CS1 → BBG M1L 34.020
Not assigned
Not priced
—
Load 5 326350 830689 —
Other / manual
CS5 → BBG M1L 33.380
Not assigned
Not priced
—
Load 6 326374 830713 —
Other / manual
CS5 → BBG M1L 36.740
Not assigned
Not priced
—
Load 7 326389 830728 —
Other / manual
CS5 → BBG M1L 35.700
Not assigned
Not priced
—
Load 8 326400 830739 —
Other / manual
CS5 → BBG M1L 34.780
Not assigned
Not priced
—
Load 9 326414 830753 —
Other / manual
CS6 → BBG M1L 35.460
Not assigned
Not priced
—
Load 10 326426 830765 —
Other / manual
CS5 → BBG M1L 31.760
Not assigned
Not priced
—
Load 11 326514 830853 —
Other / manual
CS2 → DIMI W4L40 37.080
Not assigned
Not priced
—
Load 12 326551 830890 —
Other / manual
CS2 → DIMI W4L40 34.180
Not assigned
Not priced
—
Load 13 326611 830949 —
Other / manual
CS2 → DIMI W4L40 35.660
Not assigned
Not priced
—
Load 14 326665 831003 —
Other / manual
CS2 → DIMI W4L40 34.300
Not assigned
Not priced
—
Load 15 326697 831035 —
Other / manual
CS2 → DIMI W4L40 36.260
Not assigned
Not priced
—
Load 16 326716 831054 —
Other / manual
CS2 → DIMI W4L40 34.320
Not assigned
Not priced
—
Load 17 326724 831062 —
Other / manual
CS8 → BBG MSS 30.240
Not assigned
Not priced
—
Load 18 326748 831086 —
Other / manual
CS8 → BBG MSS 36.660
Not assigned
Not priced
—
Load 19 326773 831111 —
Other / manual
CS8 → BBG MSS 35.040
Not assigned
Not priced
—
Load 20 326803 831141 —
Other / manual
CS8 → BBG MSS 33.460
Not assigned
Not priced
—
Load 21 326839 831177 —
Other / manual
CS8 → BBG MSS 31.040
Not assigned
Not priced
—
Load 22 326887 831225 —
Other / manual
CS7 → BBG MSS 35.520
Not assigned
Not priced
—
Load 23 326955 831293 —
Other / manual
CS7 → BBG MSS 31.220
Not assigned
Not priced
—
Load 24 326984 831322 —
Other / manual
CS7 → BBG MSS 31.720
Not assigned
Not priced
—
Load 25 327041 831379 —
Other / manual
CS3 → SEPTE W4L40 37.260
Not assigned
Not priced
—
Load 26 327092 831430 —
Other / manual
CS3 → SEPTE W4L40 36.740
Not assigned
Not priced
—
Load 27 327190 831528 —
Other / manual
CS2 → SEPTE W4L40 31.760
Not assigned
Not priced
—
Load 28 327228 831566 —
Other / manual
CS2 → SEPTE W4L40 33.660
Not assigned
Not priced
—
Load 29 327293 831631 —
Other / manual
CS2 → SEPTE W4L40 34.880
Not assigned
Not priced
—
Load 30 327334 831672 —
Other / manual
CS2 → SEPTE W4L40 36.640
Not assigned
Not priced
—
Load 31 327376 831714 —
Other / manual
CS3 → SEPTE W4L40 33.460
Not assigned
Not priced
—
Load 32 327406 831744 —
Other / manual
CS3 → SEPTE W4L40 32.800
Not assigned
Not priced
—
Load 33 327438 831776 —
Other / manual
CS3 → SEPTE W4L40 33.680
Not assigned
Not priced
—
Load 34 327463 831801 —
Other / manual
CS3 → SEPTE W4L40 34.740
Not assigned
Not priced
—
Load 35 327493 831831 —
Other / manual
CS3 → SEPTE W4L40 33.800
Not assigned
Not priced
—
Load 36 327517 831855 —
Other / manual
CS3 → SEPTE W4L40 35.880
Not assigned
Not priced
—
Load 37 327543 831881 —
Other / manual
CS3 → SEPTE W4L40 35.260
Not assigned
Not priced
—
Load 38 327657 831995 —
Other / manual
CS3 → SEPTE W4L40 35.220
Not assigned
Not priced
—
KFM745EC subtotal  ·  38 loads 1,311.820 0 / 38 priced R 0.00
KFZ191EC 16 completed loads Load 1 326823 831161 —
Other / manual
CS8 → BBG MSS 31.520
Not assigned
Not priced
—
Load 2 326861 831199 —
Other / manual
CS7 → BBG MSS 35.680
Not assigned
Not priced
—
Load 3 326901 831239 —
Other / manual
CS7 → BBG MSS 31.900
Not assigned
Not priced
—
Load 4 326954 831292 —
Other / manual
CS7 → BBG MSS 35.440
Not assigned
Not priced
—
Load 5 327038 831376 —
Other / manual
CS3 → SEPTE W4L40 32.240
Not assigned
Not priced
—
Load 6 327160 831498 —
Other / manual
CS2 → SEPTE W4L40 33.100
Not assigned
Not priced
—
Load 7 327201 831539 —
Other / manual
CS2 → SEPTE W4L40 34.720
Not assigned
Not priced
—
Load 8 327239 831577 —
Other / manual
CS2 → SEPTE W4L40 33.020
Not assigned
Not priced
—
Load 9 327289 831627 —
Other / manual
CS2 → SEPTE W4L40 34.660
Not assigned
Not priced
—
Load 10 327331 831669 —
Other / manual
CS2 → SEPTE W4L40 35.360
Not assigned
Not priced
—
Load 11 327392 831730 —
Other / manual
CS3 → SEPTE W4L40 34.600
Not assigned
Not priced
—
Load 12 327432 831770 —
Other / manual
CS3 → SEPTE W4L40 33.520
Not assigned
Not priced
—
Load 13 327469 831807 —
Other / manual
CS3 → SEPTE W4L40 31.180
Not assigned
Not priced
—
Load 14 327494 831832 —
Other / manual
CS3 → SEPTE W4L40 34.260
Not assigned
Not priced
—
Load 15 327524 831862 —
Other / manual
CS3 → SEPTE W4L40 36.560
Not assigned
Not priced
—
Load 16 327553 831891 —
Other / manual
CS3 → SEPTE W4L40 36.960
Not assigned
Not priced
—
KFZ191EC subtotal  ·  16 loads 544.720 0 / 16 priced R 0.00
GRAND TOTAL  ·  54 completed loads  ·  2 vehicles 1,856.540 t 0 priced / 54 unpriced R 0.00
eLOGIC · SUBCONTRACTOR PRICING

Assign Pricing to Unpriced Loads

TJS HARBILY · 16–31 December 2024

Unpriced loads54
Unpriced net tons1,856.540 t
Selected for pricing0 loads
Select Vehicle Registration RECNO TRANNO ORDERNO Source → Destination Nett Tons
KFM745EC 326218 830557 — CS5 → BBG 35.840
KFM745EC 326248 830587 — CS1 → BBG 36.140
KFM745EC 326279 830618 — CS1 → BBG 35.520
KFM745EC 326313 830652 — CS1 → BBG 34.020
KFM745EC 326350 830689 — CS5 → BBG 33.380
KFM745EC 326374 830713 — CS5 → BBG 36.740
KFM745EC 326389 830728 — CS5 → BBG 35.700
KFM745EC 326400 830739 — CS5 → BBG 34.780
KFM745EC 326414 830753 — CS6 → BBG 35.460
KFM745EC 326426 830765 — CS5 → BBG 31.760
KFM745EC 326514 830853 — CS2 → DIMI 37.080
KFM745EC 326551 830890 — CS2 → DIMI 34.180
KFM745EC 326611 830949 — CS2 → DIMI 35.660
KFM745EC 326665 831003 — CS2 → DIMI 34.300
KFM745EC 326697 831035 — CS2 → DIMI 36.260
KFM745EC 326716 831054 — CS2 → DIMI 34.320
KFM745EC 326724 831062 — CS8 → BBG 30.240
KFM745EC 326748 831086 — CS8 → BBG 36.660
KFM745EC 326773 831111 — CS8 → BBG 35.040
KFM745EC 326803 831141 — CS8 → BBG 33.460
KFM745EC 326839 831177 — CS8 → BBG 31.040
KFM745EC 326887 831225 — CS7 → BBG 35.520
KFM745EC 326955 831293 — CS7 → BBG 31.220
KFM745EC 326984 831322 — CS7 → BBG 31.720
KFM745EC 327041 831379 — CS3 → SEPTE 37.260
KFM745EC 327092 831430 — CS3 → SEPTE 36.740
KFM745EC 327190 831528 — CS2 → SEPTE 31.760
KFM745EC 327228 831566 — CS2 → SEPTE 33.660
KFM745EC 327293 831631 — CS2 → SEPTE 34.880
KFM745EC 327334 831672 — CS2 → SEPTE 36.640
KFM745EC 327376 831714 — CS3 → SEPTE 33.460
KFM745EC 327406 831744 — CS3 → SEPTE 32.800
KFM745EC 327438 831776 — CS3 → SEPTE 33.680
KFM745EC 327463 831801 — CS3 → SEPTE 34.740
KFM745EC 327493 831831 — CS3 → SEPTE 33.800
KFM745EC 327517 831855 — CS3 → SEPTE 35.880
KFM745EC 327543 831881 — CS3 → SEPTE 35.260
KFM745EC 327657 831995 — CS3 → SEPTE 35.220
KFZ191EC 326823 831161 — CS8 → BBG 31.520
KFZ191EC 326861 831199 — CS7 → BBG 35.680
KFZ191EC 326901 831239 — CS7 → BBG 31.900
KFZ191EC 326954 831292 — CS7 → BBG 35.440
KFZ191EC 327038 831376 — CS3 → SEPTE 32.240
KFZ191EC 327160 831498 — CS2 → SEPTE 33.100
KFZ191EC 327201 831539 — CS2 → SEPTE 34.720
KFZ191EC 327239 831577 — CS2 → SEPTE 33.020
KFZ191EC 327289 831627 — CS2 → SEPTE 34.660
KFZ191EC 327331 831669 — CS2 → SEPTE 35.360
KFZ191EC 327392 831730 — CS3 → SEPTE 34.600
KFZ191EC 327432 831770 — CS3 → SEPTE 33.520
KFZ191EC 327469 831807 — CS3 → SEPTE 31.180
KFZ191EC 327494 831832 — CS3 → SEPTE 34.260
KFZ191EC 327524 831862 — CS3 → SEPTE 36.560
KFZ191EC 327553 831891 — CS3 → SEPTE 36.960
Pricing is per metric ton. Each priced load uses the upstream raw NETTWEIGHT converted from kilograms to metric tons (÷ 1,000), then multiplies by its saved subcontractor-rate snapshot, with VAT calculated per line and rounded to cents. VAT-inclusive rates are NOT charged VAT twice. Monetary totals sum priced loads only; 54 unpriced load(s) are excluded, so the amount is partial. This is a subcontractor settlement statement, not a tax invoice.
Saved ticket corrections applied: 0.
Statement validation: 2 period-dated transaction(s) excluded because NETTWEIGHT is zero/negative or missing; 0 API row(s) excluded because TRANDATETIME could not be read; 0 exact duplicate(s) ignored; 1,247 completed load(s) have no TRANSPORTER; 0 completed load(s) have no TRUCKNO.
One completed load is one transaction whose TRANDATETIME falls within the selected date range (both periods, one half-month, or a custom range within the selected calendar month) and whose NETTWEIGHT is greater than zero. Unique vehicle count is based on TRUCKNO; missing numbers are not counted as vehicles. Crysler and Buick NETTWEIGHT values are configured as kilograms and divided by 1,000 to metric tons before any summary or R/ton payment calculations; verify against the weighbridge slip. Train rate defaults are configured per subcontractor; new unpriced T/BT train loads receive the selected tariff, while VS vessel loads need manual pricing. Saved pricing is a R/ton subcontractor rate snapshot; it does not overwrite API data. Money is calculated to two decimals per load, including VAT per saved price settings. The selected payment statement remains provisional until its payment period ends. When all transporters are selected, unique vehicles are counted across the whole fleet; the same truck can appear under more than one transporter. Upstream transaction data is never changed; local pricing assignments are saved in MySQL.